120-Year Old Industrial Space Renovated as Historic Destination

120-Year Old Industrial Space Renovated as Historic Destination

Lightweight aggregate from Arcosa Lightweight helps protect and stabilize a historic Birmingham structure, the Powell Avenue Steam Plant, originally built in 1895. Redeveloped by Alabama Power, the building is being preserved for its future as a downtown destination.

Birmingham, Alabama, known as “The Magic City,” rapidly became the industrial center of the South. Today, 145 years later, it is recognized worldwide for medical research, banking, and high-tech manufacturing. The city’s historic core is undergoing revitalization, with new developments rising alongside restored landmarks from the past century.

Bridge Deck Replacement
The building as it appeared in 1901

One such landmark is the former steam plant that powered Birmingham’s downtown and streetcar system.

Clayton McKinnon, P.E., who was Director of Business Development at Hoar Construction during the restoration project, notes, “The facility was the original power plant for downtown Birmingham. We started here in 2013, decommissioning the plant, focusing on structural restoration, and getting the building stabilized for future use.”

McKinnon, now the Regional Development Director for the Gulf States Office at Agracel, oversaw the early stages of the project.

Challenge: Reducing Wall Stress


During the restoration, the team had to address the north side of the building, which had been backfilled in the 1930s when a railroad was elevated through downtown Birmingham. This created potential stresses on the walls, especially when the team needed to excavate to install waterproofing.

Geotechnical engineers from Bhate Geosciences and LBYD Civil and Structural Engineers selected lightweight aggregate from Arcosa to protect the century-old walls. McKinnon explains,

“After investigating several options, lightweight aggregate emerged as the best solution due to its properties.”

Arcosa’s lightweight aggregate, produced at the Livingston, Alabama plant, reduces the density of compacted fills by up to half. This significantly lessens lateral pressure on structures, making it ideal for sensitive projects like this one.

Bridge Deck Replacement

Results: A Stabilized Future


The 18-inch-thick brick walls of the former steam plant were successfully reinforced, with McKinnon noting, “The use of lightweight aggregate reduced stresses on the wall by about half, ensuring it will last another century.”

Although redevelopment is currently on hold, the structure has been stabilized and preserved for future use. Its next chapter as a historic destination in downtown Birmingham is ready to unfold.

TEXAS

14885 South Interstate 45
Streetman, Texas 75859
(903) 599-3000

CALIFORNIA

17410 E Lockwood Valley Rd
Frazier Park, CA 93225
(661) 245-3736

COLORADO

11728 Highway 93
Boulder, CO 80303
(303) 499-1010

ALABAMA

201 Industrial Street
Livingston, AL 35470
(205) 652-9688

LOUISIANA

12652 Airline Hwy
Erwinville, LA 70729
(800) 342-5483

ARKANSAS

3719 Mounds Rd
Proctor, AR 72376
(800) 342-5483

KENTUCKY

1797 Coral Ridge Road
Shepherdsville, KY 40165
(502) 957-2103

INDIANA

6618 N Tidewater Rd
Mooresville, IN 46158
(317) 831-0710